HVAC Systems for Offshore Projects (Wind farm Platforms, Marine, Oil & Gas) are quite different from onshore applications. The Major differences are
- Stringent Codes and Standards Requirements & Offshore Specific Standards (NORSOK, SOLAS, DNVGL, ISO15138, ISO7547, ISO8861, ISO8862 etc.)
- Salt laden ambient air (Material Selection to avoid Corrosion)
- Big Wind Load On Externally Mounted Equipment
- Multiple operation modes (Manned, Un-Manned, Purging, Emergency etc.) and associated complex control system
- Transport loads, which demands additional supports
- Cost of work at Offshore is multifold times higher than onshore yard work and hence precise Engineering, Installation and Commissioning (to the extent possible) should be completed onshore
- Require a high degree of RAM (Reliability, Availability, Maintainability) for technical buildings
- Temporary HVAC system for sea transport
- Temporary Refuge System
- Purge System
- Hazardous, Explosion Proof/ATEX Equipment
- Chemical and Coalescer filtration
- Positive and Negative Pressurization and its control
- Material handling, Weight Control Reports
PEC has a team of Experienced Engineering and 3D Modelers and to engineer and deliver high-standard design to our customers.
SERVICES:
- Chilled Water System
- Seawater Cooled System
- DX-AHU System
- Natural Ventilation, Forced Ventilation
- Provision Plant Chiller-Freezer System
- Emergency A/C System
- 3D Modelling (PDMS and PDS)